// Adds dimensions UUID, Author and Topic into GA4
Monday, June 22, 2026
27.2 C
Singapore

Analyst opined lapsed Bandar Malaysia deal defunct from the start

Political and economics analyst Professor Hoo Ke Ping opined that the Bandar Malaysia deal which lapsed last week is a defunct project from the beginning.

He said the current excess in numbers of office and residential units within the city and Klang Valley was already a bane to the market, what more if Bandar Malaysia and TRX City was developed.

Hoo said the financial and banking system in Malaysia was a bane on the future development of residential or commercial units as banks are more stringent with issuing property loans.

‘There is a clear mismatch of deposit and lending which means the Bandar Malaysia project will require hefty finances in the future so the question is can the bank sustain when issuing loans?”

He said with the current slow growth, Malaysia was already in the right spot for over exposure and with the Bandar Malaysia project spanning to another 10 years, the nation will go into a liquidity crisis.

Hoo said there was no need to push for the Bandar Malaysia project as there is no implication to the country with the deal falling through.

“Why push for more property development when there is an excess capacity within the city?”

The Bandar Malaysia deal is estimated to be valued at RM7.41 billion was lapsed on May 3 after TRX City Sdn Bhd claimed that the conglomerate between Iskandar Waterfront Holdings Sdn Bhd (IWH) and China Railway Engineering Corp (M) Sdn Bhd (CREC) failed to meet payment obligations thus causing the deal to stand null and void with immediate effect.

TRX City retained its 100% ownership of the site while inviting the expression of interest for the role of master developer for the project.

The project is slated to be Malaysia’s key transportation hub — connecting the Kuala Lumpur-Singapore High-Speed Rail (HSR), Mass Rapid Transit lines, the Keretapi Tanah Melayu Komuter alongside the Express Rail Link and 12 major highways.

The land development was initially awarded to the 1Malaysia Development Bhd who selected the conglomerate to undertake the development but following the restructuring of 1MDB’s finances, the land was handed over to the Finance Ministry.

- Advertisement -

Hot this week

‘Sinking hole in my chest’: Fresh graduate opens up about rejection from S$7.5k role after six interview rounds

SINGAPORE: A fresh graduate recently admitted on social media that they have been struggling to come to terms with being rejected for a role they desperately wanted after making it all the way to t...

Singaporeans react after tourist says locals seem to ‘work a few hours and then sit around all day’

SINGAPORE: A tourist who visited Singapore for about two weeks last year said online that he wanted to move here after sharing his observations of what seemed like a relaxed work culture in the cit...

Popular Categories

document.addEventListener("DOMContentLoaded", () => { const trigger = document.getElementById("ads-trigger"); if ('IntersectionObserver' in window && trigger) { const observer = new IntersectionObserver((entries, observer) => { entries.forEach(entry => { if (entry.isIntersecting) { lazyLoader(); // You should define lazyLoader() elsewhere or inline here observer.unobserve(entry.target); // Run once } }); }, { rootMargin: '800px', threshold: 0.1 }); observer.observe(trigger); } else { // Fallback setTimeout(lazyLoader, 3000); } });
// //
Enable Notifications OK No thanks