Mahathir confirms JB-Singapore RTS Link will resume without delay with 36% cost cut
Malaysian Prime Minister Tun Dr Mahathir Mohamed confirmed today (31) that the construction of the Rapid Transit System (RTS) Link between Johor Bahru and Singapore will resume without further delay and that the project will be built with a 36 per cent cost cut. He said: “The cost of the project has been reduced by … Continue reading Mahathir confirms JB-Singapore RTS Link will resume without delay with 36% cost cut
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed